The Journey of Doha Metro project, Red Line South Underground was initiated in June 2013, writing a new chapter in Qatar history. QDVC is the leader of a joint-venture comprising the local Al Darwish Engineering and the Korean GS Engineering & Contracting.

The scope of Red Line South contract comprises the design and construction of the underground works below central Doha, including 5 underground stations, 5 Switchboxes, 4 Emergency Exits and 35 Cross passages with a design life of +120 years.

Project Details
1
Client:
Qatar Rail Company
Contractors:

QDVC 55%, GS E&C 25% & Al Darwish Engineering 20%

Start date:

            June 2013

Finish date:

2019

4 main operating lines

35 km of tunnel

5 Tunnel Boring Machines

5 Underground stations

5 Switchboxes

4 Emergency

35 Interconnection tunnels (cross passages)